3 deadlines NoticeGuard models for Iowa: what each one counts from, the statute it was read from, and the statute text.

Information, not legal advice. This app reports what the statute says and cites the section it read. It is not legal advice, it does not file anything for you, and it does not tell you what to do.
Verify with the statute or an attorney. Statutes change, and courts reinterpret them. Every deadline in this app comes from a statute read on the date shown next to its citation - that snapshot can go out of date. Missing a mechanics lien deadline can extinguish your claim permanently, so confirm any deadline you are relying on with an attorney licensed in that state before you act on it.
Data verified: statute text retrieved 2026-09-21 (each citation below carries its own date). Rule data from the NoticeGuard app, source commit 22f9300.

Deadlines at a glance

DeadlineCounted fromApplies toStatute
Post lien for full strength90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIowa Code § 572.9 (sole operative sentence)
Post lien (outer bound)820 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIowa Code § 572.9 (sole operative sentence)
Bring action to enforce the lien820 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIowa Code § 572.27 (sole operative sentence)

Work out a date for Iowa with the calculator

Each deadline, with the statute

Post lien for full strength

Posted to the Mechanics' Notice and Lien Registry (MNLR), counted from this claimant's own last day of furnishing labor or materials - posting by this date gives the lien its full, unreduced strength.

What it counts from. 90 days after last furnishing (last day on site).

Applies to. Original contractor, Subcontractor, Supplier, Preconstruction service.

Iowa Code § 572.9 (sole operative sentence)
Official source · statute text retrieved 2026-09-21

“The statement of account required by section 572.8 shall be posted by a general contractor or subcontractor within two years and ninety days after the date on which the last of the material was furnished or the last of the labor was performed.”

If the date is missed (the statute's own terms). Posting after this date does not lose the lien outright - see the sibling "post lien by outer bound" rule - but the lien is then reduced in strength under § 572.11 rather than full-strength.

Also stated next to this deadline.

Post lien (outer bound)

Posted to the Mechanics' Notice and Lien Registry (MNLR), counted from this claimant's own last day of furnishing labor or materials - the absolute cutoff. Posting after the 90-day marker above (but before this date) requires giving the owner written notice and reduces the lien's reach.

What it counts from. 820 days after last furnishing (last day on site).

Applies to. Original contractor, Subcontractor, Supplier, Preconstruction service.

Iowa Code § 572.9 (sole operative sentence)
Official source · statute text retrieved 2026-09-21

“The statement of account required by section 572.8 shall be posted by a general contractor or subcontractor within two years and ninety days after the date on which the last of the material was furnished or the last of the labor was performed.”

If the date is missed (the statute's own terms). The statute's own operative language: the statement of account "shall be posted... within" this period - no valid posting is possible after it.

Also stated next to this deadline.

Bring action to enforce the lien

Counted from this claimant's own last day of furnishing labor or materials - NOT from when the lien was actually posted. The statute runs this from two years after the expiration of the 90-day mark following last furnishing, arriving at the same total as the outer posting bound above.

What it counts from. 820 days after last furnishing (last day on site).

Applies to. Original contractor, Subcontractor, Supplier, Preconstruction service.

Iowa Code § 572.27 (sole operative sentence)
Official source · statute text retrieved 2026-09-21

“Any action to enforce a mechanic's lien shall be brought within two years from the expiration of ninety days after the date on which the last of the material was furnished or the last of the labor was performed.”

If the date is missed (the statute's own terms). The statute's own operative language: an action "shall be brought within" this period - an action not brought within it is time-barred.

Also stated next to this deadline.

Weekend and holiday rollover

NoticeGuard does not model a weekend or holiday extension for Iowa. The dates above are the plain count from the date you enter. Check whether a Saturday, Sunday or holiday changes your date.

What this rule set does not cover

Keep track of the dates