Mechanics lien and notice deadlines by state

172 deadlines across 51 jurisdictions (50 states and DC), each with the statute it was read from. Pick a state below, or use the calculator.

Information, not legal advice. This app reports what the statute says and cites the section it read. It is not legal advice, it does not file anything for you, and it does not tell you what to do.
Verify with the statute or an attorney. Statutes change, and courts reinterpret them. Every deadline in this app comes from a statute read on the date shown next to its citation - that snapshot can go out of date. Missing a mechanics lien deadline can extinguish your claim permanently, so confirm any deadline you are relying on with an attorney licensed in that state before you act on it.
Data verified: statute text retrieved between 2026-09-08 and 2026-10-02 (each state page and citation carries its own date). Rule data from the NoticeGuard app, source commit 22f9300.

Calculator

Choose a state, your role and the dates you know. The calculator runs the same rules code as the NoticeGuard app, including its day counts, its caps and its weekend and holiday rollover where a state has one. It runs in your browser and sends nothing anywhere.

Pick a state

All deadlines

The same data as the app's quick reference. The periods are written the way the app writes them. Some statutes state a period in months or years; where the app converts that to a day count, the rule's note on the state page says it is approximated, and the conversion is chosen so the date does not land after the statutory one.

StateDeadlineCounted fromApplies toStatute
AlabamaFile verified statement of lien (original contractor)180 days after last furnishing (last day on site)Original contractorCode of Alabama § 35-11-215 (sole operative sentence)
AlabamaFile verified statement of lien (subcontractor, supplier, or preconstruction service provider)120 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceCode of Alabama § 35-11-215 (sole operative sentence)
AlaskaRecord claim of lien (no notice of completion recorded)120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when no date is entered for notice of completion filed
AS § 34.35.068 (a)
AlaskaRecord claim of lien (notice of completion recorded)15 days after notice of completion filedOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when a date is entered for notice of completion filed
AS § 34.35.068 (b)(1)
AlaskaCommence action to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceAS § 34.35.080 (a)
ArizonaPreliminary twenty day notice20 days after first furnishing (commenced work)Original contractor, Subcontractor, Supplier, Preconstruction serviceArizona Revised Statutes § 33-992.01 (C)
ArizonaRecord notice and claim of lien (no notice of completion recorded)120 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when no date is entered for notice of completion filed
Arizona Revised Statutes § 33-993 (A)
ArizonaRecord notice and claim of lien (notice of completion recorded)60 days after notice of completion filedOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when a date is entered for notice of completion filed
Arizona Revised Statutes § 33-993 (A)
ArizonaFile action to foreclose the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceArizona Revised Statutes § 33-998 (A)
ArkansasSend commercial notice of nonpayment75 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceArkansas Code Annotated § 18-44-115 (b)(4)-(5)
ArkansasFile lien statement120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceArkansas Code Annotated § 18-44-117 (a)(1)
ArkansasCommence action to enforce the lien450 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceArkansas Code Annotated § 18-44-119 (a)-(b)
CaliforniaPreliminary (20-day) notice20 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceCalifornia Civil Code § 8204 (a)
CaliforniaRecord the mechanics lien (direct contractor)90 days after final completion of the original contract, but no later than 60 days after notice of completion filed (whichever is earlier)Original contractorCalifornia Civil Code § 8412 (a)-(b)
CaliforniaRecord the mechanics lien (subcontractor, supplier, or preconstruction service)90 days after final completion of the original contract, but no later than 30 days after notice of completion filed (whichever is earlier)Subcontractor, Supplier, Preconstruction serviceCalifornia Civil Code § 8414 (b)
CaliforniaCommence an action to enforce the lien90 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceCalifornia Civil Code § 8460 (a)
ColoradoFile the lien statement120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceC.R.S. § 38-22-109 (5)
ColoradoCommence an action to enforce the lien, and record notice of it180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceC.R.S. § 38-22-110 (sole section, "Action commenced within six months")
ConnecticutFile original contractor's affidavit15 days after first furnishing (commenced work)Original contractorConnecticut General Statutes § 49-35 (a) (proviso)
ConnecticutServe notice of intent to claim a lien90 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceConnecticut General Statutes § 49-35 (a)
ConnecticutLodge certificate of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceConnecticut General Statutes § 49-34 (1)
ConnecticutServe copy of certificate on owner30 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceConnecticut General Statutes § 49-34 (2)
ConnecticutCommence foreclosure suit and file lis pendens365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceConnecticut General Statutes § 49-39 (sole operative sentence)
DelawareFile statement of claim (contractor in direct privity)180 days after final completion of the original contractOriginal contractor25 Del. C. § 2711 (a)(1)
DelawareFile statement of claim (subcontractor, supplier, or preconstruction service provider)120 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service25 Del. C. § 2711 (b)
District of ColumbiaRecord notice of intent90 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction serviceD.C. Code § 40-301.02 (a)(1)
District of ColumbiaFile suit to enforce the lien and record notice of pendency180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceD.C. Code § 40-303.13 (a)(1)
FloridaNotice to owner45 days after first furnishing (commenced work)Subcontractor, SupplierFlorida Statutes § 713.06 (2)(a)
FloridaClaim of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier
only when no date is entered for original contract terminated before completion
Florida Statutes § 713.08 (5) (first sentence)
FloridaClaim of lien (original contract terminated under s. 713.07(4))90 days after last furnishing (last day on site), but no later than 90 days after original contract terminated before completion (whichever is earlier)Original contractor, Subcontractor, Supplier
only when a date is entered for original contract terminated before completion
Florida Statutes § 713.08 (5) (second sentence)
FloridaAction to enforce lien (no notice of contest served)365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier
only when no date is entered for notice of contest of lien served
Florida Statutes § 713.22 (1)
FloridaAction to enforce lien (after notice of contest of lien served)60 days after notice of contest of lien servedOriginal contractor, Subcontractor, Supplier
only when a date is entered for notice of contest of lien served
Florida Statutes § 713.22 (2)
GeorgiaFile claim of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceO.C.G.A. § 44-14-361.1 (a)(2)
GeorgiaCommence a lien action to recover the claim365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceO.C.G.A. § 44-14-361.1 (a)(3)
HawaiiFile Application For A Lien and Notice Of Lien (no notice of completion published)410 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when no date is entered for notice of completion filed
Hawaii Revised Statutes § 507-43 (b), (g)
HawaiiFile Application For A Lien and Notice Of Lien (notice of completion published)45 days after notice of completion filedOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when a date is entered for notice of completion filed
Hawaii Revised Statutes § 507-43 (b), (f)
IdahoClaim of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIdaho Code § 45-507 (2)
IdahoAction to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceIdaho Code § 45-510 (1)
IllinoisFile the claim for lien or bring suit (to preserve priority against third parties)120 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction service770 ILCS 60 § 7 (a)
IllinoisFile the claim for lien as to the owner, and commence any foreclosure action730 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction service770 ILCS 60 §§ 7 and 9 7(a); 9 (final sentence)
IllinoisSubcontractor's written notice to owner90 days after final completion of your own workSubcontractor, Supplier, Preconstruction service770 ILCS 60 § 24 (a)
IllinoisNotify the owner that you recorded the lien (owner-occupied single-family home)10 days after notice of construction lien recordedOriginal contractor
only when you tick "This is a single-family residence that the owner lives in"
770 ILCS 60 § 7 (d)
IndianaFile the sworn statement and notice of intention to hold a lien (default)90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you do not tick "This is a Class 2 structure (a building or townhouse of one or two dwelling units, or a qualifying outbuilding)"
Indiana Code § 32-28-3-3 (a)
IndianaFile the sworn statement and notice of intention to hold a lien (Class 2 structure)60 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you tick "This is a Class 2 structure (a building or townhouse of one or two dwelling units, or a qualifying outbuilding)"
Indiana Code § 32-28-3-3 (b)
IndianaFile a complaint to enforce the lien365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceIndiana Code § 32-28-3-6 (a)
IowaPost lien for full strength90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIowa Code § 572.9 (sole operative sentence)
IowaPost lien (outer bound)820 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIowa Code § 572.9 (sole operative sentence)
IowaBring action to enforce the lien820 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceIowa Code § 572.27 (sole operative sentence)
KansasFile lien statement (original contractor)120 days after last furnishing (last day on site)Original contractorKansas Statutes Annotated § 60-1102 (a)
KansasFile lien statement (subcontractor or supplier)89 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceKansas Statutes Annotated § 60-1103 (a)(1)
KansasBring action to foreclose the lien365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceKansas Statutes Annotated § 60-1105 (a)
KentuckyPre-lien notice (claim under $1,000)75 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceKentucky Revised Statutes § 376.010 (4)(a)
KentuckyPre-lien notice (claim of $1,000 or more)120 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceKentucky Revised Statutes § 376.010 (4)(a)
KentuckyFile lien statement180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceKentucky Revised Statutes § 376.080 (1)
KentuckyMail copy of lien statement to owner7 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceKentucky Revised Statutes § 376.080 (1)
KentuckyBring action to enforce the lien365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceKentucky Revised Statutes § 376.090 (1)
LouisianaFile statement of claim or privilege (no notice of termination filed)60 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when no date is entered for notice of completion filed
Louisiana Revised Statutes § 9:4822 (A)
LouisianaFile statement of claim or privilege (notice of termination filed)60 days after notice of completion filedOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when a date is entered for notice of completion filed
Louisiana Revised Statutes § 9:4822 (A)
LouisianaInstitute action to enforce the claim or privilege365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceLouisiana Revised Statutes § 9:4823 (A)(2)
MaineRecord statement of claim (no contract with owner)90 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service10 M.R.S. § 3253 (1)
MaineFile action to preserve and enforce the lien120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service10 M.R.S. § 3255 (1)
MarylandNotice to owner of intention to claim a lien120 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceMd. Real Property § 9-104 (a)(1)
MarylandFile the petition to establish the lien180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceMd. Real Property § 9-105 (a)
MarylandFile a petition to enforce the established lien365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceMd. Real Property § 9-109 (sole operative sentence)
MassachusettsNotice of Contract90 days after last furnishing (last day on site), but no later than 60 days after notice of completion filed (whichever is earlier)Original contractor, Subcontractor, Supplier, Preconstruction serviceM.G.L. c. 254, §§ 2 and 4 (deadline paragraph)
MassachusettsStatement of Account120 days after last furnishing (last day on site), but no later than 90 days after notice of completion filed (whichever is earlier)Original contractor, Subcontractor, Supplier, Preconstruction serviceM.G.L. c. 254 § 8 (deadline paragraph)
MassachusettsNotice of Identification30 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceM.G.L. c. 254 § 4 (Notice of Identification paragraph)
MassachusettsCommence a civil action to enforce the lien90 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceM.G.L. c. 254 § 11 (sole operative sentence)
MichiganNotice of furnishing20 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceMCL § 570.1109 (1)
MichiganRecord the claim of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceMCL § 570.1111 (1)
MichiganServe a copy of the recorded claim of lien15 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceMCL § 570.1111 (5)
MichiganCommence an action to enforce the construction lien365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceMCL § 570.1117 (1)
MinnesotaSubcontractor's or supplier's notice to owner45 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceMinn. Stat. § 514.011 Subd. 2(a)
MinnesotaRecord and serve the lien statement120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceMinn. Stat. § 514.08 Subd. 1
MinnesotaCommence a foreclosure action365 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceMinn. Stat. § 514.12 Subd. 3
MississippiSend preliminary notice (no privity of contract)30 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceMississippi Code Annotated § 85-7-407 (2)
MississippiFile claim of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceMississippi Code Annotated § 85-7-405 (1)(b)
MississippiCommence payment action180 days after notice of construction lien recorded, but no later than 90 days after notice of contest of lien served (whichever is earlier)Original contractor, Subcontractor, Supplier, Preconstruction serviceMississippi Code Annotated § 85-7-421 (1)
MissouriFile the mechanic's lien statement180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceRSMo § 429.080 (sole operative sentence)
MissouriCommence an action to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceRSMo § 429.170 (sole operative sentence)
MontanaGive notice of right to claim a lien20 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceMont. Code Ann. § 71-3-531 (3)
MontanaFile lien (no notice of completion filed)90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when no date is entered for notice of completion filed
Mont. Code Ann. § 71-3-535 (1)(a)
MontanaFile lien (notice of completion filed)90 days after notice of completion filedOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when a date is entered for notice of completion filed
Mont. Code Ann. § 71-3-535 (1)(b)
MontanaCommence action to enforce the lien730 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceMont. Code Ann. § 71-3-562 (sole operative sentence)
NebraskaRecord construction lien120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceNebraska Revised Statute § 52-137 (1)
NebraskaSend copy of recorded lien to owner10 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceNebraska Revised Statute § 52-135 (3)
NebraskaInstitute judicial proceedings to enforce the lien730 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceNebraska Revised Statute § 52-140 (1)
NevadaNotice of right to lien31 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceNevada Revised Statutes § 108.245 (1)
NevadaRecord the notice of lien (no notice of completion)90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when no date is entered for notice of completion filed
Nevada Revised Statutes § 108.226 (1)(a)
NevadaRecord the notice of lien (notice of completion recorded)40 days after notice of completion filedOriginal contractor, Subcontractor, Supplier, Preconstruction service
only when a date is entered for notice of completion filed
Nevada Revised Statutes § 108.226 (1)(b)
NevadaCommence an action to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceNevada Revised Statutes § 108.233 (1)
New HampshireSecure the lien by attachment120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceN.H. Rev. Stat. Ann. § 447:9, § 447:10 (sole operative sentences)
New JerseyLodge the lien claim (non-residential)90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you do not tick "This is a residential construction contract (a one-, two-, or three-family dwelling)"
N.J.S.A. § 2A:44A-6 a.(2)
New JerseyLodge the lien claim (residential construction contract)120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you tick "This is a residential construction contract (a one-, two-, or three-family dwelling)"
N.J.S.A. § 2A:44A-6 a.(2)
New JerseyNotice of Unpaid Balance and Right to File Lien (residential construction contract)60 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you tick "This is a residential construction contract (a one-, two-, or three-family dwelling)"
N.J.S.A. § 2A:44A-21 (b)(1)
New JerseyCommence an action to enforce the lien claim365 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceN.J.S.A. § 2A:44A-14 (a)
New MexicoGive notice of right to claim a lien (second-tier-and-deeper claimants)60 days after first furnishing (commenced work)Supplier, Preconstruction serviceNMSA 1978 § 48-2-2.1 (B)
New MexicoFile claim of lien (original contractor)120 days after final completion of the original contractOriginal contractorNMSA 1978 § 48-2-6 (A)
New MexicoFile claim of lien (subcontractor, supplier, or preconstruction service provider)90 days after final completion of the original contractSubcontractor, Supplier, Preconstruction serviceNMSA 1978 § 48-2-6 (A)
New MexicoSend copy of filed claim to owner15 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceNMSA 1978 § 48-2-6 (B)
New MexicoCommence proceedings to enforce the lien730 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceNMSA 1978 § 48-2-10 (sole operative sentence)
New YorkFile notice of lien (general property)240 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you do not tick "This property is a single-family dwelling"
New York Lien Law § 10 (1)
New YorkFile notice of lien (single-family dwelling)120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you tick "This property is a single-family dwelling"
New York Lien Law § 10 (1)
New YorkCommence foreclosure, file an extension, or obtain a court order to keep the lien alive365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceNew York Lien Law § 17 (first paragraph, "Duration of lien")
North CarolinaFile claim of lien on real property120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceN.C. Gen. Stat. § 44A-12 (b)
North CarolinaCommence an action to enforce the lien180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceN.C. Gen. Stat. § 44A-13 (a)
North DakotaRecord construction lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceN.D.C.C. § 35-27-13 (sole operative sentence)
North DakotaAbsolute outer deadline to record a lien1095 days after first furnishing (commenced work)Original contractor, Subcontractor, Supplier, Preconstruction serviceN.D.C.C. § 35-27-14 (sole operative sentence, second sentence)
North DakotaCommence action and record lis pendens1095 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceN.D.C.C. § 35-27-25 (sole operative sentence, fourth sentence)
OhioNotice of furnishing21 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceOhio Revised Code § 1311.05 (A)
OhioFile the affidavit for mechanics' lien (one-/two-family dwelling or condominium unit)60 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you tick "This property is a one- or two-family dwelling, or a residential condominium unit"
Ohio Revised Code § 1311.06 (B)(1)
OhioFile the affidavit for mechanics' lien (other property)75 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service
only when you do not tick "This property is a one- or two-family dwelling, or a residential condominium unit"
Ohio Revised Code § 1311.06 (B)(3)
OhioOuter limit to commence an action to enforce the lien2190 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceOhio Revised Code § 1311.13 (C)
OklahomaSend pre-lien notice75 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceOklahoma Statutes Title 42 § 142.6 (B)(1)
OklahomaFile lien statement (original contract track)120 days after last furnishing (last day on site)Original contractorOklahoma Statutes Title 42 § 142 (sole operative sentence)
OklahomaFile lien statement (subcontractor track)90 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction serviceOklahoma Statutes Title 42 § 143 (sole operative sentence)
OklahomaBring civil action to enforce the lien365 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceOklahoma Statutes Title 42 § 172 (sole operative sentence)
OregonPerfect lien (labor, material, or equipment-rental claimants)75 days after last furnishing (last day on site), but no later than 75 days after final completion of the original contract (whichever is earlier)Original contractor, Subcontractor, SupplierOregon Revised Statutes § 87.035 (1)
OregonPerfect lien (preconstruction service provider)75 days after final completion of the original contractPreconstruction serviceOregon Revised Statutes § 87.035 (1)
OregonFile suit to enforce the lien120 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceOregon Revised Statutes § 87.055 (sole operative sentence)
PennsylvaniaFile the mechanics' lien claim180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction service49 P.S. § 1502 (a)(1)
PennsylvaniaServe notice of the filed claim on the owner28 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction service49 P.S. § 1502 (a)(2)
PennsylvaniaCommence an action to obtain judgment on the claim730 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction service49 P.S. § 1701 (b)
PennsylvaniaOuter limit to obtain a verdict or judgment1825 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction service49 P.S. § 1701 (d)
Rhode IslandMail and file notice of intention200 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceR.I. Gen. Laws § 34-28-4 (a)
Rhode IslandFile complaint to enforce lien and notice of lis pendens40 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceR.I. Gen. Laws § 34-28-10 (a)
South CarolinaFile and serve lien statement90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceS.C. Code Ann. § 29-5-90 (sole operative sentence)
South CarolinaCommence suit to enforce the lien180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceS.C. Code Ann. § 29-5-120 (A)
South DakotaFile lien statement120 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceS.D.C.L. § 44-9-15 (sole operative sentence)
South DakotaAssert lien in an enforcement action2190 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceS.D.C.L. § 44-9-24 (sole operative sentence)
TennesseePrime contractor's suit to enforce the lien365 days after final completion of the original contractOriginal contractorTenn. Code Ann. § 66-11-106 (sole sentence, "Duration of lien")
TennesseeNotice of nonpayment (remote contractor)90 days after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you do not tick "This is a one-, two-, three-, or four-family residential improvement"
Tenn. Code Ann. § 66-11-145 (a)
TennesseeRecord sworn statement / serve notice of lien90 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier, Preconstruction serviceTenn. Code Ann. §§ 66-11-112 and 66-11-115 112(a); 115(a)(2)
TexasOriginal contractor's lien affidavit (commercial)The 15th day of the 4th month after final completion of the original contractOriginal contractor
only when you do not tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.052 (a)(1)
TexasOriginal contractor's lien affidavit (residential)The 15th day of the 3rd month after final completion of the original contractOriginal contractor
only when you tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.052 (a)(2)
TexasSubcontractor's or supplier's lien affidavit (commercial)The 15th day of the 4th month after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you do not tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.052 (b)
TexasSubcontractor's or supplier's lien affidavit (residential)The 15th day of the 3rd month after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.052 (c)
TexasRetainage claim's lien affidavitThe 15th day of the 3rd month after final completion of the original contractSubcontractor, Supplier, Preconstruction service
only when you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.052 (d)
TexasNotice of claim for unpaid labor or materials (commercial)The 15th day of the 3rd month after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you do not tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.056 (a-1)(1)
TexasNotice of claim for unpaid labor or materials (residential)The 15th day of the 2nd month after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.056 (a-1)(2)
TexasNotice of claim for unpaid retainage30 days after final completion of the original contractSubcontractor, Supplier, Preconstruction service
only when you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.057 (a-1)
TexasSuit to foreclose the lien (original contractor, commercial)The 15th day of the 16th month after final completion of the original contractOriginal contractor
only when you do not tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.158 (a)
TexasSuit to foreclose the lien (original contractor, residential)The 15th day of the 15th month after final completion of the original contractOriginal contractor
only when you tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.158 (a)
TexasSuit to foreclose the lien (subcontractor or supplier, commercial)The 15th day of the 16th month after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you do not tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.158 (a)
TexasSuit to foreclose the lien (subcontractor or supplier, residential)The 15th day of the 15th month after last furnishing (last day on site)Subcontractor, Supplier, Preconstruction service
only when you tick "This is a residential construction project" and you do not tick "The original contract was signed before January 1, 2022 (an earlier Texas statute governs it, and this app does not cover that one)"
Texas Property Code § 53.158 (a)
UtahPreliminary notice20 days after first furnishing (commenced work)Original contractor, Subcontractor, SupplierUtah Code § 38-1a-501 (1)(a)
UtahRecord notice of construction lien (no notice of completion filed)180 days after final completion of the original contractOriginal contractor, Subcontractor, Supplier
only when no date is entered for notice of completion filed and you do not tick "I provided substantial work after the certificate of occupancy or final inspection"
Utah Code § 38-1a-502 (1)(a)(i)
UtahRecord notice of construction lien (notice of completion filed)90 days after notice of completion filed, but no later than 180 days after final completion of the original contract (whichever is earlier)Original contractor, Subcontractor, Supplier
only when a date is entered for notice of completion filed and you do not tick "I provided substantial work after the certificate of occupancy or final inspection"
Utah Code § 38-1a-502 (1)(a)(ii)
UtahRecord notice of construction lien (substantial work after certificate of occupancy)180 days after final completion of your own workSubcontractor
only when you tick "I provided substantial work after the certificate of occupancy or final inspection"
Utah Code § 38-1a-502 (1)(b)
UtahServe copy of recorded lien on owner30 days after notice of construction lien recordedOriginal contractor, Subcontractor, SupplierUtah Code § 38-1a-502 (4)(a)
UtahFile action to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, SupplierUtah Code § 38-1a-701 (2)(a)(ii)
UtahNotice of preconstruction service20 days after preconstruction service commencedPreconstruction serviceUtah Code § 38-1a-401 (1)(a)
UtahRecord notice of preconstruction lien90 days after preconstruction service completedPreconstruction serviceUtah Code § 38-1a-402 (1)
VermontRecord memorandum of lien180 days after payment due date (for the last labor or materials furnished)Original contractor, Subcontractor, Supplier, Preconstruction service9 V.S.A. § 1921 (c)
VermontCommence action to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction service9 V.S.A. § 1924 (sole operative sentence)
VirginiaFile the memorandum of lien90 days after last furnishing (last day on site), but no later than 90 days after final completion of the original contract (whichever is earlier)Original contractor, Subcontractor, Supplier, Preconstruction serviceCode of Virginia § 43-4 (sole operative paragraph)
VirginiaCommence suit to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceCode of Virginia § 43-17 (sole operative paragraph)
VirginiaSecond notice for personal liability of owner or general contractor30 days after final completion of the original contractSubcontractor, Supplier, Preconstruction serviceCode of Virginia § 43-11 (2)
WashingtonPreliminary notice of right to claim a lien60 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceRevised Code of Washington § 60.04.031 (1)
WashingtonRecord the claim of lien90 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceRevised Code of Washington § 60.04.091 (first paragraph)
WashingtonFile an action to foreclose the lien240 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceRevised Code of Washington § 60.04.141 (first sentence)
West VirginiaRecord notice of mechanic's lien (original contractor)100 days after final completion of the original contractOriginal contractorW. Va. Code § 38-2-8 (sole operative sentence)
West VirginiaGive and record notice of mechanic's lien (subcontractor)100 days after final completion of your own workSubcontractorW. Va. Code § 38-2-9 (sole operative sentence)
West VirginiaRecord notice of mechanic's lien (supplier furnishing directly to owner)100 days after last furnishing (last day on site)Supplier, Preconstruction serviceW. Va. Code § 38-2-10 (sole operative sentence)
West VirginiaCommence action to enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceW. Va. Code § 38-2-34 (a)
WisconsinPrime contractor's notice to owner10 days after first furnishing (commenced work)Original contractor
only when you tick "This project is wholly residential with 4 or fewer family living units"
Wis. Stat. § 779.02 (2)(a)
WisconsinSubcontractor's or supplier's notice to owner60 days after first furnishing (commenced work)Subcontractor, Supplier, Preconstruction serviceWis. Stat. § 779.02 (2)(b)
WisconsinFile the claim for lien180 days after last furnishing (last day on site)Original contractor, Subcontractor, Supplier, Preconstruction serviceWis. Stat. § 779.06 (1)
WisconsinCommence an action to enforce the lien730 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceWis. Stat. § 779.06 (1)
WyomingFile lien statement (contractor)150 days after last furnishing (last day on site), but no later than 150 days after final completion of the original contract (whichever is earlier)Original contractorWyo. Stat. § 29-2-106 (a)
WyomingFile lien statement (subcontractor, supplier, or preconstruction service provider)120 days after last furnishing (last day on site), but no later than 120 days after final completion of the original contract (whichever is earlier)Subcontractor, Supplier, Preconstruction serviceWyo. Stat. § 29-2-106 (a)
WyomingCommence action to foreclose or enforce the lien180 days after notice of construction lien recordedOriginal contractor, Subcontractor, Supplier, Preconstruction serviceWyo. Stat. § 29-2-109 (sole operative sentence)

Keep track of the dates